Studi Kelayakan dan Pengembangan Security Master Plan (SMP) Serta Implementasi Perbaikan dan Peningkatan Performa Sistem SMP Tahap-1

Project Name : Studi Kelayakan dan Pengembangan Security Master Plan (SMP) Serta Implementasi Perbaikan dan Peningkatan Performa Sistem SMP Tahap-1 End User : Badak NGL Year : 2013-2014   Background SMP (Security Master Plan) in PT Badak NGL (PTB) is a security monitoring system integration consisting of several sub-systems, namely …

Wonderware PCN Compliance – CS15701766

Project Name : Wonderware PCN Compliance – CS15701766 Client/End User : ConocoPhillips Indonesia Year : 2011-2014   Background ConocoPhillips Indonesia requires engineering and maintenance including the manpower, tools and services to complete System Engineer for supporting Wonderware PCN Compliance service at ConocoPhillips Indonesia’s Areas. Contractor shall perform the Work at …

Engineering & Maintenance Services for Instrumentation and Automation System

Project Name : Engineering & Maintenance Services for Instrumentation and Automation System Client/End User : ConocoPhillips Indonesia Year : 2014-2017   Background As part of ConocoPhillips Indonesia’s maintenance program to ConocoPhillips Indonesia’s facilities to ensure continuos and uninterrupted of supply to be commited under Sales Agreement, ConocoPhillips Indonesia Intends to …

Sembilang Reactivation Plan Conceptual Study (Pre-FEED)

Project Name : Sembilang Reactivation Plan Conceptual Study (Pre-FEED) Client : PT Mandiri Panca Usaha Year : 2013   Background The Sembilang Field is a small, faulted hydrocarbon accumulation located on the western edge of the South Natuna Sea Block “B” Contract Area (“Block B”). The field has been shut-in …

Technology of Security System in Relation with Security and Safety Aspects

Title : Technology of Security System in Relation with Security and Safety Aspects Date : 20th March 2013 Located : Luxton Hotel, Bandung, West Java, Indonesia Organized by : Mr. Yogie Kusumah N. Talker : Mr. Edi Laksono  

RBI (Risk Based Inspection) Course

Description This course presents a comprehensive and practical introduction and application of the latest techniques in Risk-Based Inspection (RBI) analysis of inspection results based on API BRD 581, and API RP 580 standards. It discusses practical techniques for application of RBI for the analysis of equipment, equipment defects and degradation. …

Maintenance & Reliability

Development of Maintenance and Integrity System Development of Maintenance and Integrity system   shall be based on management of Risk and Reliability. This to ensure that MIS is align with availability target of the facilty and also align with AIPSM requirement –Asset Integrity Process Safety Management.  It started with  Asset Register …

Job Vacancies

Please drop your resume to Human Resources Department: PT. SCADA PRIMA CIPTA Jl. Kembar 1 No. 12 Bandung 40253 Jawa Barat – Indonesia Phone/Fax: +62 22 5223648 / +62 22 5206258 Email: recruit@scada.co.id