Project Name : Implementation of Risk Based Inspection (RBI) Study interfacing with Jambi Merang’s SAP – PM Module
End User : JOB Pertamina-Talisman Jambi Merang
Year : 2014
Background
JOB Pertamina-Talisman Jambi Merang requires engineering service study to perform Risk Based Inspection (RBI) assessment that are currently considered as very important process to give more accurate and detailed map of equipments or assets condition to enhance the integrity of its inspection, operation and maintenance
The methodology that will be used in this study is mainly based on API 581. It will be used as the main references for the methodology to perform risk based inspection of onshore facilities. Furthermore, as required by JOB Pertamina-Talisman, to support the information integration in this study, PT. SCADA PRIMA CIPTA will use RBI software to support the assessment. The software are developed by PT. SCADA PRIMA CIPTA such that the authorized project personnel related to these applications are generally very familiar with these products and it will not need long time for the software configuration set-up and customization. All of these application-software tools are very flexible and have link capability to other applications that may be performed in both directions (data import and export)
Scope of Work
Following are the detail scope of work of this project:
- Project Definition Session
- Perform RBI assessment using API 581 to obtain Risk Ranking for Pressure vessels and pipings.
- Inspection Plan
- Joint Study Session
- RBI Assessment Final Report
- Qualitative Analysis
- Semi Quantitative Analysis
- Quantitative Analysis
- Damage Mechanism Summary
- Inspection Plan Summary
- Work Pack
- Piping Classification
- Corrosion Rate Assessment
- Maintenance Mitigation and Recommendation
- RBI Software License
- Training RBI methodology, RBI Assessment, and RBI software
- Final Report
Deliverables
The deliverables of this project is:
- Risk Ranking
- Inspection Plan
- RBI Assessment Final Report
- Qualitative Analysis
- Semi Quantitative Analysis
- Quantitative Analysis
- Damage Mechanism Summary
- Inspection Plan Summary
- Work Pack
- Join Study Session
- Piping Classification
- Corrosion Rate Assessment
- Maintenance Mitigation and Recommendation
- RBI Software PROMIA (Probabilistic Management of Integrity Assistant) license evergreen (unlimited)
- Training RBI methodology and RBI software