Project Experiences Detail

Implementation of Risk Based Inspection (RBI) Study interfacing with Jambi Merang’s SAP – PM Module

Project Name : Implementation of Risk Based Inspection (RBI) Study interfacing with Jambi Merang’s SAP – PM Module End User : JOB Pertamina-Talisman Jambi Merang Year : 2014 Background JOB Pertamina-Talisman Jambi Merang requires engineering service study to perform Risk Based Inspection (RBI) assessment that are currently considered as very important process to give more […]

Implementation of Risk Based Inspection (RBI) Study interfacing with Jambi Merang’s SAP – PM Module Read More »

Implementation of Reliability Centered Maintenance (RCM) Study interfacing with Jambi Merang’s SAP – PM Module

Project Name : Implementation of Reliability Centered Maintenance (RCM) Study interfacing with Jambi Merang’s SAP – PM Module End User : JOB Pertamina-Talisman Jambi Merang Year : 2014 Background JOB Pertamina-Talisman is the developing the Jambi Merang PSC area fields of Sungai Kenawang (SK) and Pulai Gading (PG), to produce gas and condensates reserves for

Implementation of Reliability Centered Maintenance (RCM) Study interfacing with Jambi Merang’s SAP – PM Module Read More »

Studi Kelayakan dan Pengembangan Security Master Plan (SMP) Serta Implementasi Perbaikan dan Peningkatan Performa Sistem SMP Tahap-1

Project Name : Studi Kelayakan dan Pengembangan Security Master Plan (SMP) Serta Implementasi Perbaikan dan Peningkatan Performa Sistem SMP Tahap-1 End User : Badak NGL Year : 2013-2014   Background SMP (Security Master Plan) in PT Badak NGL (PTB) is a security monitoring system integration consisting of several sub-systems, namely systems CCTV, Intercom, Access Control

Studi Kelayakan dan Pengembangan Security Master Plan (SMP) Serta Implementasi Perbaikan dan Peningkatan Performa Sistem SMP Tahap-1 Read More »

Wonderware PCN Compliance – CS15701766

Project Name : Wonderware PCN Compliance – CS15701766 Client/End User : ConocoPhillips Indonesia Year : 2011-2014   Background ConocoPhillips Indonesia requires engineering and maintenance including the manpower, tools and services to complete System Engineer for supporting Wonderware PCN Compliance service at ConocoPhillips Indonesia’s Areas. Contractor shall perform the Work at ConocoPhillips Indonesia’s office in Jakarta.

Wonderware PCN Compliance – CS15701766 Read More »

Engineering & Maintenance Services for Instrumentation and Automation System

Project Name : Engineering & Maintenance Services for Instrumentation and Automation System Client/End User : ConocoPhillips Indonesia Year : 2014-2017   Background As part of ConocoPhillips Indonesia’s maintenance program to ConocoPhillips Indonesia’s facilities to ensure continuos and uninterrupted of supply to be commited under Sales Agreement, ConocoPhillips Indonesia Intends to develop Long Terms Services Contract

Engineering & Maintenance Services for Instrumentation and Automation System Read More »

Sembilang Reactivation Plan Conceptual Study (Pre-FEED)

Project Name : Sembilang Reactivation Plan Conceptual Study (Pre-FEED) Client : PT Mandiri Panca Usaha Year : 2013   Background The Sembilang Field is a small, faulted hydrocarbon accumulation located on the western edge of the South Natuna Sea Block “B” Contract Area (“Block B”). The field has been shut-in and temporarily abandoned by previous

Sembilang Reactivation Plan Conceptual Study (Pre-FEED) Read More »