Studi Kelayakan dan Pengembangan Security Master Plan (SMP) Serta Implementasi Perbaikan dan Peningkatan Performa Sistem SMP Tahap-1

Project Name : Studi Kelayakan dan Pengembangan Security Master Plan (SMP) Serta Implementasi Perbaikan dan Peningkatan Performa Sistem SMP Tahap-1

End User : Badak NGL

Year : 2013-2014

 

Background

SMP (Security Master Plan) in PT Badak NGL (PTB) is a security monitoring system integration consisting of several sub-systems, namely systems CCTV, Intercom, Access Control and Fence. SMP system centered at SCCC. Each sub-system is built from SMP different systems and integrated through the Human Machine Interface (HMI – IART)

 

Integrated SMP is installed at PTB facility since 2005. There are some problems that arise as follows

  • The warranty period is up, the less support from contractors
  • No software installer, backup of applications and configurations
  • Documentation of the installed system is less complete (almost not available)
  • There are several components that already and started obsolete
  • There have been some damage to components
  • Replacement of some components cause the system not running

 

 

Scope of Work for Feasibility Study (Year 2013)

The scope of work of the Feasibility Study as follows

  1. the initial field data collection
  2. Conduct preliminary design analysis

To comprehensively map the architecture of the system is installed and create a description of each sub-system and their functions

  1. Conduct further field data collection (2nd site survey)

To complete lack the information needed in order to make a detailed analysis and system configuration details and their functions. All information sub-system deficiencies will be completed during this advanced field data collection.

  1. Perform detailed analysis and review of the SMP configuration installed
  2. Provide recommendations for improving the performance of SMP
  3. Make a draft roadmap and strategy implementation
  4. Provide connections in the oil and gas companies for the purpose of benchmarking on the recommendation system upgrade
  5. Conduct JSS (Join Study Session) with the PTB’s Team
  6. i) Creating documentation consisting of
    • Drawing SMP system installed (detailed data flow from sub-systems SMP)
    • Roadmap for upgrade scenarios and Recommendations
    • List of hardware and software to be upgraded
    • Draft budgetary and implementation schedule for upgrading SMP

 

Scope of Work Implementation Phase-1 (Year 2014)

The scope of work of the Implementation Phase-1 is as follows

  1. Installation and configuration of hardware and software applications IART
  • Installation of Wizcon Axeda Supervisor application version 9.0 on two (2) units of computers
  • Conduct Wizcon Axeda Supervisor application configuration version 9.0 on 2 (two) new computer unit and 3 units above an existing workstation computer (Existing Client IART) including video viewer application, change the alarm event, tags and scripts necessary.
  • Ensuring the integration of applications Access Control System (Amadeus 5), CCTV Viewer, Perimeter Security System / Fence Alarm System, Intercom System can operate well within specifications there.
  1. Installation and configuration of hardware and software applications Access Control.
  2. Installation and configuration of hardware and software applications Perimeter Security System / Fence Alarm System
  3. Installation and configuration of IP Video Encoder and Network Video Recorder (NVR)
  4. Testing and Commissioning
  5. Onsite Training

security-master-plan-01

security-master-plan-02

security-master-plan-03